Applying her administrative agency experience, Maria provides regulatory guidance to energy and renewable development clients, be it on litigation or transactional matters.

In the wake of winter storm Uri, ERCOT market participants are grappling with the resulting financial fallout. Many are now familiar with actions the Texas Public Utility Commission took during the February weather event with the intent to bring and maintain as much generation online as possible – notably ordering ERCOT to implement a temporary adjustment to the scarcity pricing mechanism designed to result in real time prices reaching the system-wide high offer cap at the statutory maximum of $9,000/mWh during the height of the generation forced outages.

Now, more than two months removed from the storm, the resulting financial impacts are having serious repercussions across the ERCOT market. Several retail electric providers have filed for bankruptcy, lawsuits are underway against a wide swath of market participants and regulators (ERCOT, the Public Utility Commission, generators, REPs, gas utilities, etc.), and countless market participants are faced with paying record-high bills for a range of reasons, including the need to procure energy in the real-time market during scarcity conditions, to obtain high priced gas supplies, to cover positions when their resources incurred outages, or exposure to uplift of default amounts owed to ERCOT. Complicating that, ERCOT has failed to pay many who did perform during the storm due to the short payment of some market participants, which means those who performed may not soon realize revenue associated with that performance. Additionally, the higher prices for power and ancillary services prompted ERCOT to substantially increase Counter-Party collateral requirements. Last month, the Public Utility Commission issued an order in Docket 51812 extending the deadline to dispute ERCOT invoices related to the winter event from 10 business days (under the current ERCOT Protocols) to six months. Since this order, the Commission has taken no additional action to address issues related to settlement invoices resulting from the storm.

At the January 17, 2019 Open Meeting, the Public Utility Commission of Texas (Commission) addressed several highly contested issues, including storage, Operating Reserve Demand Curve, Real-Time Co-optimization, and Marginal Losses. First, in Project No. 48023, Rulemaking to Address the Use of Non-Traditional Technologies in Electric Delivery Service (the Battery Project), dealing with utility ownership of battery storage, the Commission decided to defer further action until Texas Legislature’s regular session concludes. This decision comes after 63 comments were filed with the Commission, expressing widely varying views on whether a transmission and distribution utility within ERCOT may legally own and operate battery storage facilities. The Commission previously submitted through its Scope of Competition Report a request for the Legislature to enact legislation clarifying this legal point.

The Public Utility Commission of Texas has finalized the recommendations it will include in its upcoming 2019 Report on the Scope of Competition in Electric Markets in Texas to the 86th Texas Legislature, which goes into session January 8, 2019. The Commission voted on the recommendations at its December 20, 2018 meeting; the most significant

Potomac Economics, the Independent Market Monitor (IMM) for the ERCOT market, released its “2017 State of the Market Report for the ERCOT Electricity Markets,” which contains several important insights for market participants and offered seven recommendations for market improvements.

Prices and Demand Move Higher in 2017

First, the IMM found that energy prices increased 14.7% over 2016, to $28.25 per MWh. This price is still significantly less than 2011’s average annual price of $52.23 per MWh and even 2014’s average annual price of $40.64 per MWh. The 2017 price increase correlates with a 22% increase in the cost of natural gas, the most widely-used fuel in ERCOT, as fuel costs represent the majority of most suppliers’ marginal production costs.  The IMM also found price convergence to be very good in 2017, with the day-ahead and real-time prices both averaging $26 per MWh.  However, the absolute difference between day-ahead and real-time prices still increased from $7.44 per MWh in 2016 to $8.60 per MWh in 2017.

Average demand also increased, rising 1.9% from 2016, with demand in the West Zone seeing the largest average load increase at 8.3% (possibly due to oil and natural gas production activity in that zone). Despite this increase in average demand, peak demand in ERCOT reached 69,512 MW on July 28, 2017, which is lower than the ERCOT-wide coincident peak hourly demand record of 71,100 MW, set on August 11, 2016.  Even with general price and demand increases, market conditions were rarely tight as real-time prices didn’t exceed $3,000 per MWh and exceeded $1,000 per MWh for just 3.5 hours in all of 2017.

Congestion Costs Skyrocket

Surprisingly, the IMM found congestion in the ERCOT real-time market increased considerably, contributing significantly to price increases in 2017 with total congestion costs equaling $967 million – a 95% increase from 2016.  The IMM stated that this increase is due to three main factors: (1) limitations on export capacity from the Panhandle; (2) planned outages associated with the construction of the Houston Import Project; and (3) the aftermath of Hurricane Harvey.

While congestion was more frequent in 2017 than in 2016, congestion on the North to Houston constraint declined after June due to the completion of a new 1,200 MW combined cycle generator located in Houston. The completion of the Houston Import Project in 2018 should reduce congestion in this area even further.

It appears the Texas Legislature has taken note of the several news articles and industry insiders sounding the alarm bells for ratepayers to brace for record high electricity prices this summer in a market applauded for its consistently low prices. The Committee convened because the Lt. Governor charged it to study/respond to the reserve margin

On October 25, 2017, Commissioner Keith Anderson of the Texas Public Utility Commission (PUCT) released a memo regarding the draft Preliminary Order in which he expresses concerns over the application submitted by Sempra Energy to purchase Oncor Electric Delivery (the state’s largest utility) for $9.45 billion.  The memo, which results from Commissioner Anderson’s continued concern regarding the financing of the deal, requested that the Commission add to their preliminary order in order to require Sempra to clarify several issues during the hearing on the merits.

In the memo, Commissioner Anderson states

As you are all aware, hurricane Harvey had a major impact on Texas and has left many residents without power.  On August 28th, in order to facilitate the monitoring of the effects of the hurricane, the PUCT opened PUC Project 47552 – Issues Related to the Disaster Resulting From Hurricane Harvey.  At

During the Public Utility Commission of Texas (PUCT) open meeting today, the commissioners unanimously approved, with no substantive discussion, a proposed order finding that the sale of Oncor Electric to NextEra Energy is not in the public interest.

On October 31, 2016, NextEra and Oncor had filed a Joint Report and Application with the PUCT seeking the regulatory approvals required for NextEra to acquire Oncor.  NextEra was hoping to acquire both the approximately 80% interest in Oncor indirectly held by Energy Future Holdings Corp. (EFH), which is currently in bankruptcy, and the 19.75% interest indirectly held by Texas Transmission Holdings Corporation.  In addition,

At the start of today’s Public Utility Commission of Texas (PUCT) open meeting, Chairman Donna Nelson announced that May 15, 2017 will be her final day at the commission.  This is a month before she was speculated to be leaving the commission.  In order to fill her vacant space, the Governor must appoint a replacement.

While the